Where conservatories are constructed to a new build property, they may fall under cover of the warranty. Any subsequent defect found would most likely be exempt from Building Regulations but could result in a claim under the relevant policy.
Where it is intended by the developer to construct a conservatory at the same time as a feature of the completed dwelling and is separated from the main dwelling accommodation by the house external wall with a permanent external door or combined window and door opening fitted, this will on completion be included under cover of the warranty, even though it is exempt from Building Regulations.
If the design plans show a conservatory provision and the reconstruction costs include for a conservatory, then the conservatory must also be included at completion to be able to sign off for warranty purposes.
In these circumstances check for the following:
If there is no apparent provision for a conservatory on the site plans, but between the CoA (Certificate of Approval) and the CoI (Certificate of Insurance) being issued a conservatory is proposed to be built at the request of the house purchaser OR foundations have been dug out for a conservatory, and work is progressing but not completed when a completion inspection sign off is required for the main house, then the risk management surveyor will not be able to sign off the house until the conservatory is completed.
Sun lounges (largely glazed annexes with solid roofs) or conservatories that are open through to the main dwelling with no provision of an external quality thermal door or window to separate the two areas thermally, would not be exempt from the Building regulations and are classed as extensions which must meet the requirements of both Building Regulations and the Technical Manual.
Recommendations
Warranty surveyors will be vigilant to any activity on site that may result in work that falls under warranty cover. Where it is noted that additional works that will or may include a conservatory are being added at the same time as the new house (even if the conservatory is not complete) then warranty cover will extend to that conservatory. The developer must ensure the work meets the requirements of the Technical Manual as described above and is complete before the warranty surveyor is able to sign of the property.
If the surveyor is aware that ‘post completion’ a conservatory is to be built, notes will be made on the warranty site records to confirm that no conservatory existed at completion. If possible a photograph of the relevant elevation will also be taken for records.
Read more technical articles on the Resource Hub or sign up to receive our blog round-up.
Every care was taken to ensure the information in this article was correct at the time of publication. Guidance provided does not replace the reader’s professional judgement and any construction project should comply with the relevant Building Regulations or applicable technical standards. For the most up to date Premier Guarantee technical guidance please refer to your Risk Management Surveyor and the latest version of the Premier Guarantee Technical Manual.